City Build Manchester have carried out numerous projects in the Education Sector.  Works range from small refurbishment, through to new builds and Campus redevelopments.  Our staff are fully DBS checked, and are experienced in working in occupied premises, including Nurseries, Primary Schools, Secondary Schools, Colleges and Universities.

 

AMBLESIDE CAMPUS 

University of Cumbria

Works to regenerate Ambleside campus took place over 18months, and included the refurbishment of 7 buildings across the campus, as well as new soft and hard landscaping.

PROJECT SHEET

New Maths block

Winstanley College

City Build were appointed to refurbish the existing Maths Block at Winstanley College.  Works included an extension to the existing building, and a full internal and external refurbishment

PROJECT SHEET

LeCTURE THEATRES

University of Manchester

City Build Manchester Limited where appointed to carry out the full refurbishment of 4 Nr lecture theatres in the Schuster Building for The University of Manchester.

PROJECT SHEET

Student Services

Runshaw College

The project was undertaken on a design and build basis with the brief to create an impressive 21st century entrance to the college, which could accommodate the flow of 3,000 students at key times during the day and include facilities such as a café bar, main reception area, seminar rooms, offices and a multi faith room with Wudu facilities. To accommodate these diverse requirements and provide a contemporary feel to the building, a two storey solution in a “figure of eight” configuration was provided with the main circulation areas and café on the ground floor and the other facilities provided on the 1st floor.

PROJECT SHEET

Framework Agreement

University of Salford

City Build Manchester Limited where appointed to undertake the extensive refurbishment of the Core Toilet and Teaching Areas throughout the University campus. The rolling programme of works was procured as part of our framework agreement with the University.

The original framework agreement was based on an 18 month Construction period with a value of £2 million. However due to the success of the project the quantity of works were increased substantially resulting in the final expenditure being in excess of £3.2 million and a revised Contract duration of 30 months.

PROJECT SHEET

Stopford and Roscoe Buildings

University of Manchester

City Build Manchester Limited has recently completed the Alteration and Refurbishment works to 6nr lecture Theatres and 3nr office areas in the Stopford and Roscoe Buildings for the University of Manchester.

The works were undertaken as part of the University’s Frameworks Agreement, which we have been heavily involved with for some four years.

PROJECT SHEET

Campus Alterations

Etihad Stadium

Citybuild were recently engaged to undertake this project to alter and adapt the existing executive suites and hospitality boxes within the East Stand of the Etihad Stadium so they could be used by UCFB to provide excellent Higher Education facilities on non-match days. UCFB already have such facilities at Wembley and Burnley FC.