42nd Street

Custard Pie Properties

City Build Manchester have completed a new office development in Manchester City Centre for 42nd Street a company who provides support and counselling for young people. The brief was to deliver a unique building which would encourage the Charities young people to use the facilities on offer. A major Challenge of the project was to deliver such a building for the Charities firm budget of £750,000.00 and within the 26 weeks available. The Constricted Site with Great Ancoats Street to the front and sandwiched between two existing Buildings added to the Challenges of the project.

PROJECT SHEET

City @ Home

MCFC

City Build Manchester Limited where appointed to Design and Construct the new executive / administration office development for Manchester City Football Club at the City of Manchester Stadium Complex. The brief was to design and construct over 1200m2 of state of the art offices to be used by the Club’s executives, marketing, administration and accountancy teams. In addition the scheme had to include a Starbucks Refectory area for the use of the buildings occupants and visitors. The Project had a 20 week Construction period with a budget of £1.85 million. The project was completed on time and within budget.

PROJECT SHEET

Farjo

Farjo Clinic

City Build have recently successfully delivered the extensive refurbishment, alteration and fit out works for the Farjo Hair Institute who are a world renowned hair replacement specialists based in Manchester City Centre. The new Institute is a high specification research and education centre which explores and develops new pioneering hair transplant techniques and surgery. The project involved the complete renovation of a four storey town house with tight contraints in the city centre.

PROJECT SHEET .

AMBLESIDE CAMPUS 

University of Cumbria

Works to regenerate Ambleside campus took place over 18months, and included the refurbishment of 7 buildings across the campus, as well as new soft and hard landscaping.

PROJECT SHEET

New Maths block

Winstanley College

City Build were appointed to refurbish the existing Maths Block at Winstanley College.  Works included an extension to the existing building, and a full internal and external refurbishment

PROJECT SHEET

LeCTURE THEATRES

University of Manchester

City Build Manchester Limited where appointed to carry out the full refurbishment of 4 Nr lecture theatres in the Schuster Building for The University of Manchester.

PROJECT SHEET

ANGIOGRAPHY SUITE

Salford Royal Hospital

The scheme involved the construction of the new state of the art Angiography Suite (a medical imaging facility used to visualise the inside of the body) and a substantial new plant room erected on top of an adjoining building at Salford Royal Hospital

PROJECT SHEET

OPD Reception

Salford Royal

This award winning scheme named “Clinicians Choice Award” involved the refurbishment of the outpatient reception and associated way finding enhancement. The trust’s brand colours were utilised in the project, and the bold graphics on the floors and walls create a strong, bold identity. 

PROJECT SHEET

CRV Relcoation

Countess of Chester Hospital

City Build Manchester Limited were appointed to carry out the works associated with the Relocation of the CRV Ward at the Countess of Chester Hospital.

Works were carried out within the live Hospital over a period of 16 weeks, and involved close liaison with the Hospital Staff to ensure minimal disruption, and timely delivery.

PROJECT SHEET .

FANZONE 

Manchester City FC

City Build Manchester Limited where appointed to Construct a new £3m Entertainment Arena named “City Square” for Manchester City Football Club at the City of Manchester Stadium. The Arena consists of Fabric Canopy Covered Food and Beverage Refreshments areas, an Outdoor Covered Stage, Additional Toilet Facilities and 3nr Large Television Screens all of which have been designed to enhance the Match Day experience of the Club’s Supporters.

PROJECT SHEET

2 KITCHEN & CONCESSIONS REFURBISHMENT

Etihad Stadium

City Build Manchester Limited successfully delivered the challenging project of refurbishing the main stadium kitchen and all bar and food concessions within the Etihad stadium. The value of the project was circa £1m and delivered in just 8 weeks during the off season.

PROJECT SHEET

LEGENDS LOUNGE

MCFC

City Build Manchester Limited where appointed to Design and Refurbish the Legends, Citizens’ and Boardroom Banqueting Suites at the Etihad Stadium for Manchester City Football Club. The works undertaken within the close season were firstly to increase the capacity in each suite by reconfiguring the existing executive lounges layouts. Secondly the Suites were refurbished and furnished to provide a contemporary feel of the highest Standards.

PROJECT SHEET

CATERING BLOCK

Stepping Hill Hospital

City build recently completed the construction of a new catering building for Stockport NHS Foundation Trust at Stepping Hill Hospital. The New £2.3m building was constructed on the site of a recently demolished redundant facility in the heart of the busy hospital site to replace the outdated smaller main hospital kitchen. The new building included new commercial kitchen, food preparation, food storage, dishwashing and welfare facilities for the catering staff.

PROJECT SHEET

NEW MRI

The Christie

Works have now completed at The Christie, New MRI Project.  Successful handover was achieved on 15th June 2016.  The 39 week project involved the full refurbishment and remodeling of the existing day case areas, to form three new MRI Scanner rooms, the shell for a fourth scanner room for future use and a new plant room on top of the existing building.

PROJECT SHEET

CAPITAL WORKS Programme

Bolton PCT

City Build Manchester Limited were appointed to carry out refurbishment works to 17 Health Centres for Bolton NHS.

A flexible and controlled approach was taken in the management of the scheme, in order to accommodate the challenges of undertaking such extensive works at all sites whilst keeping the surgeries and clinics fully operational.

PROJECT SHEET .

Executive Boxes 

Manchester City FC

City Build Manchester Limited where appointed to undertake the project to refurbish all of the Executive Boxes within the City of Manchester Stadium for Manchester City Football Club. The Design and Build project to refurbish 71nr boxes was carried out during recent close seasons in a 16 week period.

PROJECT SHEET

2 KITCHEN & CONCESSIONS REFURBISHMENT

Etihad Stadium

City Build Manchester Limited successfully delivered the challenging project of refurbishing the main stadium kitchen and all bar and food concessions within the Etihad stadium. The value of the project was circa £1m and delivered in just 8 weeks during the off season.

PROJECT SHEET

MESNES PARK

Wigan Leisure & Culture Trust

City Build Manchester Limited where appointed to carry out therefurbishment and conversion works to an existing playshack building within Menes Park for Wigan Leisure and Culture Trust. The new building is to be used as an exhibition centre and a new ice cream parlour for the park users.

PROJECT SHEET