Bowker House, Bowker St, Walkden, M28 0SG

Healthcare

City Build Manchester have a strong track record in successfully delivering projects in the Healthcare Sector.  Our clients include Salford Royal University Hospital Trust, Wythenshawe Hospital, Tameside Hospital, Trafford General Hospital, Fairfield Hospital, Countess of Chester Hospital, to name a few.

We are experienced in delivering Measured Term Contracts, and traditional tendered works.  Works range from small refurbishment, through to new builds and extensions.  Our staff are fully DBS checked, and are fully trained and experienced in working in occupied premises.

ANGIOGRAPHY SUITE

Salford Royal Hospital

The scheme involved the construction of the new state of the art Angiography Suite (a medical imaging facility used to visualise the inside of the body) and a substantial new plant room erected on top of an adjoining building at Salford Royal Hospital

PROJECT SHEET

OPD Reception

Salford Royal

This award winning scheme named “Clinicians Choice Award” involved the refurbishment of the outpatient reception and associated way finding enhancement. The trust’s brand colours were utilised in the project, and the bold graphics on the floors and walls create a strong, bold identity. 

PROJECT SHEET

NEW MRI

The Christie

Works have now completed at The Christie, New MRI Project.  Successful handover was achieved on 15th June 2016.  The 39 week project involved the full refurbishment and remodeling of the existing day case areas, to form three new MRI Scanner rooms, the shell for a fourth scanner room for future use and a new plant room on top of the existing building.

PROJECT SHEET

CATERING BLOCK

Stepping Hill Hospital

City build recently completed the construction of a new catering building for Stockport NHS Foundation Trust at Stepping Hill Hospital. The New £2.3m building was constructed on the site of a recently demolished redundant facility in the heart of the busy hospital site to replace the outdated smaller main hospital kitchen. The new building included new commercial kitchen, food preparation, food storage, dishwashing and welfare facilities for the catering staff.

PROJECT SHEET

CRV Relcoation

Countess of Chester Hospital

City Build Manchester Limited were appointed to carry out the works associated with the Relocation of the CRV Ward at the Countess of Chester Hospital.

Works were carried out within the live Hospital over a period of 16 weeks, and involved close liaison with the Hospital Staff to ensure minimal disruption, and timely delivery.

PROJECT SHEET .

CAPITAL WORKS Programme

Bolton PCT

City Build Manchester Limited were appointed to carry out refurbishment works to 17 Health Centres for Bolton NHS.

A flexible and controlled approach was taken in the management of the scheme, in order to accommodate the challenges of undertaking such extensive works at all sites whilst keeping the surgeries and clinics fully operational.

PROJECT SHEET .