Bowker House, Bowker St, Walkden, M28 0SG

Sports and Leisure

Muga Pitch 

Fairfield Hospital

This project entailed provision of a new MUGA (Multi use games area) unit and the formation of a garden / outdoor space for patients of the Irwell Unit. Prior to the works commencing the area was a sparse un-cultivated area with overgrown trees to the perimeter. Once the initial setting out was completed drainage was installed throughout the area, before the concrete slab for the MUGA was poured. Access was tight for the MUGA steelwork but City Build worked closely with the supplier and the client to ensure it was delivered and installed safely.

PROJECT SHEET

SOUTH STAND FIT OUT

Etihad Stadium

Based on our excellent relationship with the client and our past record of repeatedly delivering high quality projects within the most challenging of timescales. We were engaged to fit out the newly constructed South Stand’s Joe’s, 93.20 and Legends corporate spaces. The project also involved the fit out of the concession bars, TV box and corporate lobby. A major challenge of the project was to develop a scheme which firstly met the Client’s brief, had the look and the feel of the Architect’s design intent, that could meet the strict programme and most importantly utilise locally sourced resources in line with the Club’s award winning procurement policy.

PROJECT SHEET

Retail Store Refurbishment

Manchester City FC

City Build have recently completed their 2nd substantial refurbishment project of the Manchester City’s Retail Store at the Etihad Stadium in the past five years. This challenging 6-week project was delivered in partnership with the Football Club and their clothing provider Nike over the recent close season. The project brief was to significantly alter and refurbish the existing store and 1st floor ticket offices prior to the new kit launch for 2016 / 2017 season to increase selling space and match day foot traffic capacity.

PROJECT SHEET

FANZONE 

Manchester City FC

City Build Manchester Limited where appointed to Construct a new £3m Entertainment Arena named “City Square” for Manchester City Football Club at the City of Manchester Stadium. The Arena consists of Fabric Canopy Covered Food and Beverage Refreshments areas, an Outdoor Covered Stage, Additional Toilet Facilities and 3nr Large Television Screens all of which have been designed to enhance the Match Day experience of the Club’s Supporters.

PROJECT SHEET

2 KITCHEN & CONCESSIONS REFURBISHMENT

Etihad Stadium

City Build Manchester Limited successfully delivered the challenging project of refurbishing the main stadium kitchen and all bar and food concessions within the Etihad stadium. The value of the project was circa £1m and delivered in just 8 weeks during the off season.

PROJECT SHEET

LEGENDS LOUNGE

MCFC

City Build Manchester Limited where appointed to Design and Refurbish the Legends, Citizens’ and Boardroom Banqueting Suites at the Etihad Stadium for Manchester City Football Club. The works undertaken within the close season were firstly to increase the capacity in each suite by reconfiguring the existing executive lounges layouts. Secondly the Suites were refurbished and furnished to provide a contemporary feel of the highest Standards.

PROJECT SHEET

 

MESNES PARK

Wigan Leisure & Culture Trust

City Build Manchester Limited where appointed to carry out therefurbishment and conversion works to an existing playshack building within Menes Park for Wigan Leisure and Culture Trust. The new building is to be used as an exhibition centre and a new ice cream parlour for the park users.

PROJECT SHEET